CNST 378  CONSTRUCTION ESTIMATING I (3 credits)

Preparation of detailed cost estimates based on contract documents. Identify and analyze cost components of building and site scopes of work to perform detailed quantity take-offs. Apply labor, material, and equipment pricing from RS Means. Use production rates and quantity takeoffs to prepare a preliminary construction schedule. Complete quantity takeoffs from 2D plans and from 3D BIM software models. (Cross-listed with CONE 378).

Prerequisite(s): CNST 112.