Search Results

Search Results for "CONE 319"

CONE 319  CONSTRUCTION METHODS AND EQUIPMENT (3 credits)

Characteristics, capabilities and selection of equipment and methods used in the building construction industry. Estimating job production, equipment production rates, machine operating costs, earth-moving equipment, hoisting equipment, operations analysis, and use of various other construction methods and equipment.

Prerequisite(s): CONE 206