CONE 885 CONSTRUCTION PLANNING, SCHEDULING, AND CONTROLS (3 credits)
Planning and scheduling a project using the critical path methods (CPM) with computer applications. Project pre-planning, logic networks, precedence diagrams, time estimates, critical path, float time, crash programs, scheduling, short interval schedules, pull planning, and monitoring project activities. (Cross-listed with CNST 485, CNST 885, CONE 485)
Prerequisite(s): CNST 378. Not open to non-degree graduate students.